Mining operations (pictured) at GWR Group’s C4 Deposit at the 100%-owned Wiluna West Iron Ore Project commenced in December 2020 with first shipment planned for early 2021. The export facility pictured is situated on Lease 88 at the Port of Geraldton.

The flagship Wiluna West Iron Ore Project, located 40km east of Wiluna WA is an exceptional, DSO iron ore development project, which will produce a high grade, low impurity iron ore as metallurgical tests have demonstrated.

The Wiluna West project has a 2004 JORC Code compliant Resource totalling 130.3 million tonnes at an average iron grade of 60% Fe, including 69.2M tonnes of Probable Reserves at 60.3% Fe.

Mining approvals are in place for large scale mining operations (up to 7Mtpa) over an initial mine life of 10 years.