November 29, 2024
Results of Meeting
October 30, 2024
September Quarter Activities Report and Appendix 5B
October 30, 2024
Notice of Annual General Meeting/Proxy Form
October 8, 2024
Change in Director Interests - GL, MW, TW & WH
October 2, 2024
Notification regarding unquoted securities - GWR
September 30, 2024
Annual Report to shareholders
September 30, 2024
Corporate Governance Statement and Appendix 4G
September 2, 2024
Joint Company Secretary Appointment/Resignation
August 19, 2024
GWR Investor Presentation August 2024
August 6, 2024
GWR SELLS ITS INTEREST IN THE HATCHES CREEK TUNGSTEN PROJECT
August 6, 2024
TGN: TGN TO ACQUIRE THE HATCHES CREEK TUNGSTEN PROJECT
July 31, 2024
June Quarter Activities Report and Appendix 5B
July 2, 2024
Metallurgical Drilling Commences at Prospect Ridge
June 21, 2024
Drilling & Scoping Study Commences- Prospect Ridge Magnesium
May 8, 2024
Thick Intersections up to 118m @ 43.3% Mg - Prospect Ridge
April 30, 2024
March Quarter Activities Report and Appendix 5B
April 30, 2024
Significant Advancements in Prospect Ridge Magnesite Project
March 14, 2024
Half Year Financial Report
March 7, 2024
GWR Completes Settlement - Sale of Wiluna West to GV
February 12, 2024
Results of Meeting
January 31, 2024
December Quarter Activities Report and Appendix 5B
January 11, 2024
EXTRAORDINARY GENERAL MEETING - NOTICE AND PROXY FORM
Results of Meeting
October 30, 2024
September Quarter Activities Report and Appendix 5B
October 30, 2024
Notice of Annual General Meeting/Proxy Form
October 8, 2024
Change in Director Interests - GL, MW, TW & WH
October 2, 2024
Notification regarding unquoted securities - GWR
September 30, 2024
Annual Report to shareholders
September 30, 2024
Corporate Governance Statement and Appendix 4G
September 2, 2024
Joint Company Secretary Appointment/Resignation
August 19, 2024
GWR Investor Presentation August 2024
August 6, 2024
GWR SELLS ITS INTEREST IN THE HATCHES CREEK TUNGSTEN PROJECT
August 6, 2024
TGN: TGN TO ACQUIRE THE HATCHES CREEK TUNGSTEN PROJECT
July 31, 2024
June Quarter Activities Report and Appendix 5B
July 2, 2024
Metallurgical Drilling Commences at Prospect Ridge
June 21, 2024
Drilling & Scoping Study Commences- Prospect Ridge Magnesium
May 8, 2024
Thick Intersections up to 118m @ 43.3% Mg - Prospect Ridge
April 30, 2024
March Quarter Activities Report and Appendix 5B
April 30, 2024
Significant Advancements in Prospect Ridge Magnesite Project
March 14, 2024
Half Year Financial Report
March 7, 2024
GWR Completes Settlement - Sale of Wiluna West to GV
February 12, 2024
Results of Meeting
January 31, 2024
December Quarter Activities Report and Appendix 5B
January 11, 2024
EXTRAORDINARY GENERAL MEETING - NOTICE AND PROXY FORM
December 22, 2023
$3 million deposit received in binding $30m Asset Sale
December 21, 2023
Sale of Wiluna West Iron Ore Project
December 19, 2023
Trading Halt
December 19, 2023
Pause in Trading
November 29, 2023
Results of Meeting
October 31, 2023
September Quarter Activities Report and Appendix 5B
October 27, 2023
Notice of Annual General Meeting/Proxy Form
October 20, 2023
Board Update
October 11, 2023
Date of AGM and Closing Date for Director Nominations
September 28, 2023
Corporate Governance Statement and Appendix 4G
September 28, 2023
Annual Report to shareholders
July 28, 2023
June Quarter Activities Report and Appendix 5B
April 27, 2023
March Quarter Activities Report and Appendix 5B
March 24, 2023
Appointment of Joint Company Secretary
March 20, 2023
High-Grade Magnesium Resource Definition Drilling Commences
March 16, 2023
Half Year Financial Report
March 13, 2023
C3 High Grade Iron Ore Deposit Advancing
March 10, 2023
Iron Ore Royalties Strengthens GWR Balance Sheet - C4
February 7, 2023
Final Director's Interest Notice
February 7, 2023
Initial Director's Interest Notice
February 3, 2023
Board and Executive Changes
January 31, 2023
December Quarter Activities Report and Appendix 5b
January 11, 2023
GWR Improves Iron Ore Mining rights Agreement
January 9, 2023
Final Director Interest Notices
January 9, 2023
Board Changes
$3 million deposit received in binding $30m Asset Sale
December 21, 2023
Sale of Wiluna West Iron Ore Project
December 19, 2023
Trading Halt
December 19, 2023
Pause in Trading
November 29, 2023
Results of Meeting
October 31, 2023
September Quarter Activities Report and Appendix 5B
October 27, 2023
Notice of Annual General Meeting/Proxy Form
October 20, 2023
Board Update
October 11, 2023
Date of AGM and Closing Date for Director Nominations
September 28, 2023
Corporate Governance Statement and Appendix 4G
September 28, 2023
Annual Report to shareholders
July 28, 2023
June Quarter Activities Report and Appendix 5B
April 27, 2023
March Quarter Activities Report and Appendix 5B
March 24, 2023
Appointment of Joint Company Secretary
March 20, 2023
High-Grade Magnesium Resource Definition Drilling Commences
March 16, 2023
Half Year Financial Report
March 13, 2023
C3 High Grade Iron Ore Deposit Advancing
March 10, 2023
Iron Ore Royalties Strengthens GWR Balance Sheet - C4
February 7, 2023
Final Director's Interest Notice
February 7, 2023
Initial Director's Interest Notice
February 3, 2023
Board and Executive Changes
January 31, 2023
December Quarter Activities Report and Appendix 5b
January 11, 2023
GWR Improves Iron Ore Mining rights Agreement
January 9, 2023
Final Director Interest Notices
January 9, 2023
Board Changes
December 7, 2022
Change in Director Interests
December 7, 2022
Change in Substantial Holder
November 24, 2022
Results of Meeting
October 31, 2022
Annual Report to shareholders
October 31, 2022
Quarterly Activities/Appendix 5B Cash Flow Report
October 28, 2022
Corporate Governance Statement and Appendix 4G
October 25, 2022
AGM Notice and Shareholder Letter
October 3, 2022
Full Year Statutory Accounts
September 29, 2022
Listed Option Expiry
September 27, 2022
Variation to Iron Ore Mining Rights Agreement
September 26, 2022
Change of Address
August 25, 2022
Iron Ore Mining Rights Agreement Moves Ahead
August 15, 2022
Change in Director Interests
August 1, 2022
Quarterly Activities and Cash Flow Reports
July 20, 2022
Response to ASX Price Query
July 20, 2022
Reinstatement to Official Quotation
July 20, 2022
GWR Signs Term Sheet to Grant Mining Rights
July 15, 2022
GWR Requests Continuation of Voluntary Suspension
July 13, 2022
GWR Requests Continuation of Voluntary Suspension
July 11, 2022
GWR Requests Extension to Voluntary Suspension
July 7, 2022
GWR Requests Continuation of Voluntary Suspension
July 5, 2022
Suspension from Official Quotation
July 1, 2022
Trading Halt
July 1, 2022
Pause in Trading
May 3, 2022
GWR Plans 7,350m Drilling Program - Prospect Ridge Magnesium
May 2, 2022
March Quarterly Report and Appendix 5B
April 27, 2022
GWR to Accelerate Magnesium Project Following Site Visit
April 20, 2022
C4 Iron Operations Continue Improvement & Forward Sales
March 17, 2022
Half Year Financial Report
March 7, 2022
Record Production Month Underpins Forward Iron Ore Sales
March 4, 2022
Application for quotation of securities - GWR
March 4, 2022
GWR Completes Acquisition of Advanced Magnesium Project
February 3, 2022
Application for quotation of securities - GWR
February 3, 2022
Placement Completes Raising $2 million
February 2, 2022
C4 Iron Ore Mine Back in Full Production
January 31, 2022
December Quarter Report and Appendix 5b
January 27, 2022
Proposed issue of securities - GWR
January 27, 2022
JRL: Jindalee partners with GWR at Prospect Ridge
January 27, 2022
GWR Goes Green To Acquire Advanced Magnesium Project
January 24, 2022
Trading Halt
January 17, 2022
Response to ASX Aware Query
January 12, 2022
C4 Iron Ore Mining Operations Recommenced
Change in Director Interests
December 7, 2022
Change in Substantial Holder
November 24, 2022
Results of Meeting
October 31, 2022
Annual Report to shareholders
October 31, 2022
Quarterly Activities/Appendix 5B Cash Flow Report
October 28, 2022
Corporate Governance Statement and Appendix 4G
October 25, 2022
AGM Notice and Shareholder Letter
October 3, 2022
Full Year Statutory Accounts
September 29, 2022
Listed Option Expiry
September 27, 2022
Variation to Iron Ore Mining Rights Agreement
September 26, 2022
Change of Address
August 25, 2022
Iron Ore Mining Rights Agreement Moves Ahead
August 15, 2022
Change in Director Interests
August 1, 2022
Quarterly Activities and Cash Flow Reports
July 20, 2022
Response to ASX Price Query
July 20, 2022
Reinstatement to Official Quotation
July 20, 2022
GWR Signs Term Sheet to Grant Mining Rights
July 15, 2022
GWR Requests Continuation of Voluntary Suspension
July 13, 2022
GWR Requests Continuation of Voluntary Suspension
July 11, 2022
GWR Requests Extension to Voluntary Suspension
July 7, 2022
GWR Requests Continuation of Voluntary Suspension
July 5, 2022
Suspension from Official Quotation
July 1, 2022
Trading Halt
July 1, 2022
Pause in Trading
May 3, 2022
GWR Plans 7,350m Drilling Program - Prospect Ridge Magnesium
May 2, 2022
March Quarterly Report and Appendix 5B
April 27, 2022
GWR to Accelerate Magnesium Project Following Site Visit
April 20, 2022
C4 Iron Operations Continue Improvement & Forward Sales
March 17, 2022
Half Year Financial Report
March 7, 2022
Record Production Month Underpins Forward Iron Ore Sales
March 4, 2022
Application for quotation of securities - GWR
March 4, 2022
GWR Completes Acquisition of Advanced Magnesium Project
February 3, 2022
Application for quotation of securities - GWR
February 3, 2022
Placement Completes Raising $2 million
February 2, 2022
C4 Iron Ore Mine Back in Full Production
January 31, 2022
December Quarter Report and Appendix 5b
January 27, 2022
Proposed issue of securities - GWR
January 27, 2022
JRL: Jindalee partners with GWR at Prospect Ridge
January 27, 2022
GWR Goes Green To Acquire Advanced Magnesium Project
January 24, 2022
Trading Halt
January 17, 2022
Response to ASX Aware Query
January 12, 2022
C4 Iron Ore Mining Operations Recommenced
December 29, 2021
Change of Directors' Interests Notices
December 24, 2021
Notice under section 708A(5)(e) of the Corporations Act
December 21, 2021
Application for quotation of securities - GWR
December 21, 2021
Issue of Securities
December 20, 2021
Change of Registry Address
November 26, 2021
Results of Meeting
November 12, 2021
JWD Iron Ore Mining Agreement Variation
November 9, 2021
Change in Director Interest
November 9, 2021
Change in Substantial Holding
November 1, 2021
Quarterly Activities and Cash Flow Reports
November 1, 2021
Annual Report to shareholders
October 29, 2021
Corporate Governance Statement and Appendix 4G
October 25, 2021
Notice of Annual General Meeting/Proxy Form
October 25, 2021
C4 Iron Ore Mine - October Update
October 1, 2021
Full Year Financial Statements
September 22, 2021
C4 Iron Ore Mine September Update
September 20, 2021
Trading Halt
August 17, 2021
C4 Iron Ore Deposit - Production Update
August 2, 2021
June Quarter Activities Report and Appendix 5B
July 27, 2021
Haulage Record Set & Stage 2 Pit Ore Crushing Commenced
July 21, 2021
Western Gold Resources Ltd - Official Listing
July 19, 2021
Infrastructure for Long Term Production - Desk Top Study
July 14, 2021
Term Sheet Signed for Additional 400ktpa Mine-Gate Sale
July 14, 2021
MIO: Macarthur signs term sheet with GWR Group Limited
July 2, 2021
C4 Iron Ore Production & Gold Spin Off Update
June 30, 2021
Investor Presentation
June 28, 2021
Stage 2 Mining Contract HOA Signed for C4 Iron Deposit
June 24, 2021
First Blast Opens Stage 2 High Grade Pit - C4 Iron Deposit
June 23, 2021
GWR Ramp-up Continues as Steady State Production Achieved
June 11, 2021
Appendix 3A.5 Notification of Return of Capital
June 9, 2021
Western Gold Resources IPO Offer Closed - $7m Raised
June 3, 2021
C4 Iron Ore Deposit - Stage 2 and Production Update
May 26, 2021
Western Gold Resources Ltd Prospectus
May 21, 2021
IPO Prospectus for Western Gold Resources Lodged
May 20, 2021
Results of Meeting
May 14, 2021
Correction to Director Interests
May 14, 2021
JWD High Grade Iron Deposit Ramps Up Re-negotiated Terms
May 14, 2021
FEL: Preparation for mining ramping up at JWD
May 3, 2021
Contractor Accident
May 3, 2021
March Quarterly Activities Report and Appd 5B
April 28, 2021
C4 Deposit Iron Ore - Production Update
April 21, 2021
Notice of General Meeting
April 20, 2021
GWR to IPO Wiluna West Gold Project
April 13, 2021
Iron Ore Operations Update
April 12, 2021
Wiluna West Gold Project JORC 2012 Gold Resource Update
March 25, 2021
Second Iron Ore Shipment Completed & Operational Update
March 23, 2021
Works Approval Granted - JWD High Grade Iron Ore Deposit
March 16, 2021
Interim Financial Report 31 December 2020
March 8, 2021
Iron Ore Production and Operations Update
February 10, 2021
Option Exercise and Share Issue
Change of Directors' Interests Notices
December 24, 2021
Notice under section 708A(5)(e) of the Corporations Act
December 21, 2021
Application for quotation of securities - GWR
December 21, 2021
Issue of Securities
December 20, 2021
Change of Registry Address
November 26, 2021
Results of Meeting
November 12, 2021
JWD Iron Ore Mining Agreement Variation
November 9, 2021
Change in Director Interest
November 9, 2021
Change in Substantial Holding
November 1, 2021
Quarterly Activities and Cash Flow Reports
November 1, 2021
Annual Report to shareholders
October 29, 2021
Corporate Governance Statement and Appendix 4G
October 25, 2021
Notice of Annual General Meeting/Proxy Form
October 25, 2021
C4 Iron Ore Mine - October Update
October 1, 2021
Full Year Financial Statements
September 22, 2021
C4 Iron Ore Mine September Update
September 20, 2021
Trading Halt
August 17, 2021
C4 Iron Ore Deposit - Production Update
August 2, 2021
June Quarter Activities Report and Appendix 5B
July 27, 2021
Haulage Record Set & Stage 2 Pit Ore Crushing Commenced
July 21, 2021
Western Gold Resources Ltd - Official Listing
July 19, 2021
Infrastructure for Long Term Production - Desk Top Study
July 14, 2021
Term Sheet Signed for Additional 400ktpa Mine-Gate Sale
July 14, 2021
MIO: Macarthur signs term sheet with GWR Group Limited
July 2, 2021
C4 Iron Ore Production & Gold Spin Off Update
June 30, 2021
Investor Presentation
June 28, 2021
Stage 2 Mining Contract HOA Signed for C4 Iron Deposit
June 24, 2021
First Blast Opens Stage 2 High Grade Pit - C4 Iron Deposit
June 23, 2021
GWR Ramp-up Continues as Steady State Production Achieved
June 11, 2021
Appendix 3A.5 Notification of Return of Capital
June 9, 2021
Western Gold Resources IPO Offer Closed - $7m Raised
June 3, 2021
C4 Iron Ore Deposit - Stage 2 and Production Update
May 26, 2021
Western Gold Resources Ltd Prospectus
May 21, 2021
IPO Prospectus for Western Gold Resources Lodged
May 20, 2021
Results of Meeting
May 14, 2021
Correction to Director Interests
May 14, 2021
JWD High Grade Iron Deposit Ramps Up Re-negotiated Terms
May 14, 2021
FEL: Preparation for mining ramping up at JWD
May 3, 2021
Contractor Accident
May 3, 2021
March Quarterly Activities Report and Appd 5B
April 28, 2021
C4 Deposit Iron Ore - Production Update
April 21, 2021
Notice of General Meeting
April 20, 2021
GWR to IPO Wiluna West Gold Project
April 13, 2021
Iron Ore Operations Update
April 12, 2021
Wiluna West Gold Project JORC 2012 Gold Resource Update
March 25, 2021
Second Iron Ore Shipment Completed & Operational Update
March 23, 2021
Works Approval Granted - JWD High Grade Iron Ore Deposit
March 16, 2021
Interim Financial Report 31 December 2020
March 8, 2021
Iron Ore Production and Operations Update
February 10, 2021
Option Exercise and Share Issue
December 30, 2020
Change in Director Interests
December 24, 2020
Transport of High Grade Ore to Port of Geraldton Commences
December 23, 2020
Change in Director Interests
December 22, 2020
Change in Directors's Interests
December 22, 2020
Exercise of Options
December 21, 2020
Road Transport Contract Executed - C4 Iron Deposit
December 18, 2020
WMX: Clarification on Wiluna Mining and GWR Joint Venture
December 18, 2020
Works Approval Lodged - JWD High Grade Iron Ore Project
December 17, 2020
Crusher Commissioned & First Ore Processed C4 Iron Deposit
December 16, 2020
Exercise of Options
December 16, 2020
GWR Signs C4 Offtake Agreement - Wiluna West Project Update
December 15, 2020
Trading Halt
December 15, 2020
Pause in trading
December 15, 2020
Change of Directors' Interests
December 8, 2020
Share Issue
December 8, 2020
Change in Director Interests
December 8, 2020
Review to Increase Production Tonnage Across Fe Resource
December 4, 2020
Production works Commence at C4 Iron Deposit
November 30, 2020
AGM and Investor Presentation
November 27, 2020
Results of Meeting
November 27, 2020
GWR Secures Port of Geraldton Access for Export of Iron Ore
November 25, 2020
Trading Halt
November 25, 2020
Pause in trading
November 23, 2020
Development & Site Works Update C4 High Grade DSO Iron Ore
November 20, 2020
Step out Drilling Hits Potential High Grade Fe Extensions
November 13, 2020
Mining Contract Executed for Development of C4 Iron Deposit
October 30, 2020
Quarterly Activities and Cash Flow Reports
October 29, 2020
Annual Report to shareholders
October 29, 2020
Corporate Governance Statement and Appendix 4G
October 27, 2020
Notice of Annual General Meeting
October 22, 2020
Key Infrastructure Secured to Progress Iron Ore Development
October 15, 2020
Appendix 3B
October 15, 2020
Cleansing Prospectus
October 15, 2020
Expanding the Wiluna West Gold Mineral Resource
October 9, 2020
s708A Cleansing Notice
October 9, 2020
Strategic Investments Update
October 7, 2020
Placement to Raise $3.3 Million Completes
October 7, 2020
Development Commences - C4 High-Grade DSO Iron Ore Project
October 6, 2020
JWD High Grade Iron Ore Deposit Development Update
October 1, 2020
Proposed issue of Securities - GWR
October 1, 2020
Capital Raise to Fund Production of DSO Iron Ore C4 Project
September 30, 2020
Full Year Statutory Accounts
September 28, 2020
Trading Halt
September 25, 2020
Wiluna West Projects Update
September 18, 2020
Change in Directors Interest Notice
September 9, 2020
Term Sheet for Works Contract on C4 Iron Deposit Executed
August 28, 2020
Mining Approvals Obtained for C4 Iron Ore Deposit
July 30, 2020
Quarterly Activities and Cash Flow Reports
July 29, 2020
Proposed issue of Securities - GWR
July 29, 2020
COVID-19 Update and Overhead Cost Reduction
July 23, 2020
Resignation of Joint Company Secretary
April 30, 2020
Quarterly Report and Appendix 5B
April 3, 2020
Change of Director's Interest Notice
March 9, 2020
Half Year Financial Report
January 30, 2020
December Quarterly Report and Appendix 5B
January 20, 2020
Change of Share Registry
Change in Director Interests
December 24, 2020
Transport of High Grade Ore to Port of Geraldton Commences
December 23, 2020
Change in Director Interests
December 22, 2020
Change in Directors's Interests
December 22, 2020
Exercise of Options
December 21, 2020
Road Transport Contract Executed - C4 Iron Deposit
December 18, 2020
WMX: Clarification on Wiluna Mining and GWR Joint Venture
December 18, 2020
Works Approval Lodged - JWD High Grade Iron Ore Project
December 17, 2020
Crusher Commissioned & First Ore Processed C4 Iron Deposit
December 16, 2020
Exercise of Options
December 16, 2020
GWR Signs C4 Offtake Agreement - Wiluna West Project Update
December 15, 2020
Trading Halt
December 15, 2020
Pause in trading
December 15, 2020
Change of Directors' Interests
December 8, 2020
Share Issue
December 8, 2020
Change in Director Interests
December 8, 2020
Review to Increase Production Tonnage Across Fe Resource
December 4, 2020
Production works Commence at C4 Iron Deposit
November 30, 2020
AGM and Investor Presentation
November 27, 2020
Results of Meeting
November 27, 2020
GWR Secures Port of Geraldton Access for Export of Iron Ore
November 25, 2020
Trading Halt
November 25, 2020
Pause in trading
November 23, 2020
Development & Site Works Update C4 High Grade DSO Iron Ore
November 20, 2020
Step out Drilling Hits Potential High Grade Fe Extensions
November 13, 2020
Mining Contract Executed for Development of C4 Iron Deposit
October 30, 2020
Quarterly Activities and Cash Flow Reports
October 29, 2020
Annual Report to shareholders
October 29, 2020
Corporate Governance Statement and Appendix 4G
October 27, 2020
Notice of Annual General Meeting
October 22, 2020
Key Infrastructure Secured to Progress Iron Ore Development
October 15, 2020
Appendix 3B
October 15, 2020
Cleansing Prospectus
October 15, 2020
Expanding the Wiluna West Gold Mineral Resource
October 9, 2020
s708A Cleansing Notice
October 9, 2020
Strategic Investments Update
October 7, 2020
Placement to Raise $3.3 Million Completes
October 7, 2020
Development Commences - C4 High-Grade DSO Iron Ore Project
October 6, 2020
JWD High Grade Iron Ore Deposit Development Update
October 1, 2020
Proposed issue of Securities - GWR
October 1, 2020
Capital Raise to Fund Production of DSO Iron Ore C4 Project
September 30, 2020
Full Year Statutory Accounts
September 28, 2020
Trading Halt
September 25, 2020
Wiluna West Projects Update
September 18, 2020
Change in Directors Interest Notice
September 9, 2020
Term Sheet for Works Contract on C4 Iron Deposit Executed
August 28, 2020
Mining Approvals Obtained for C4 Iron Ore Deposit
July 30, 2020
Quarterly Activities and Cash Flow Reports
July 29, 2020
Proposed issue of Securities - GWR
July 29, 2020
COVID-19 Update and Overhead Cost Reduction
July 23, 2020
Resignation of Joint Company Secretary
April 30, 2020
Quarterly Report and Appendix 5B
April 3, 2020
Change of Director's Interest Notice
March 9, 2020
Half Year Financial Report
January 30, 2020
December Quarterly Report and Appendix 5B
January 20, 2020
Change of Share Registry
December 10, 2019
Change of Director's Interest Notices
December 10, 2019
Appendix 3B
November 29, 2019
Replacement Constitution
November 22, 2019
AGM Presentation
November 22, 2019
AGM Results
November 12, 2019
Wiluna West Iron Project Strategic Review and C4 Update
October 31, 2019
September Quarterly Report and Appendix 5B
October 30, 2019
Appendix 4G
October 30, 2019
Corporate Governance Statement
October 30, 2019
2019 Annual Report
October 21, 2019
Notice of Annual General Meeting/Proxy Form
October 15, 2019
BLK: Wiluna West Joint Venture Agreement
October 14, 2019
Gold Joint Venture agreement with Blackham Resources
October 3, 2019
GWR Completes Iron Ore Mining Rights Agreement
September 20, 2019
2019 Financial Report
September 17, 2019
Wiluna West Iron Ore Mining Rights Agreement Update
September 4, 2019
Due Diligence period extended for Mining Rights Agreement
August 15, 2019
Wiluna West Gold Resource Increase
August 5, 2019
Reinstatement to Official Quotation
August 5, 2019
Mining Rights Agreement for Wiluna West Iron Deposit
July 30, 2019
June Quarterly Report and Appendix 5B
July 26, 2019
Continuation of Voluntary Suspension
July 9, 2019
Continuation of Voluntary Suspension
July 1, 2019
Continuation of Voluntary Suspension
June 18, 2019
Continuation of Voluntary Suspension
June 13, 2019
Suspension from Official Quotation
June 11, 2019
Trading Halt
June 11, 2019
Pause in Trade
June 3, 2019
Farm-in Agreement for Hatches Creek Tungsten Project
June 3, 2019
TGN: Hatches Creek Tungsten Project Farm-in Agreement
May 22, 2019
Response to ASX Price Query
May 22, 2019
Reinstatement to Official Quotation
May 22, 2019
Drilling Results Hatches Creek Project
May 21, 2019
Voluntary Suspension
May 17, 2019
Trading Halt
May 17, 2019
Pause in Trading
April 30, 2019
March Quarterly Report and Appendix 5B
April 29, 2019
Project Updates
March 8, 2019
Half Year Accounts
January 31, 2019
December Quarter Report and Cashflow
January 15, 2019
Exciting Drilling Results Wiluna West Gold Project
Change of Director's Interest Notices
December 10, 2019
Appendix 3B
November 29, 2019
Replacement Constitution
November 22, 2019
AGM Presentation
November 22, 2019
AGM Results
November 12, 2019
Wiluna West Iron Project Strategic Review and C4 Update
October 31, 2019
September Quarterly Report and Appendix 5B
October 30, 2019
Appendix 4G
October 30, 2019
Corporate Governance Statement
October 30, 2019
2019 Annual Report
October 21, 2019
Notice of Annual General Meeting/Proxy Form
October 15, 2019
BLK: Wiluna West Joint Venture Agreement
October 14, 2019
Gold Joint Venture agreement with Blackham Resources
October 3, 2019
GWR Completes Iron Ore Mining Rights Agreement
September 20, 2019
2019 Financial Report
September 17, 2019
Wiluna West Iron Ore Mining Rights Agreement Update
September 4, 2019
Due Diligence period extended for Mining Rights Agreement
August 15, 2019
Wiluna West Gold Resource Increase
August 5, 2019
Reinstatement to Official Quotation
August 5, 2019
Mining Rights Agreement for Wiluna West Iron Deposit
July 30, 2019
June Quarterly Report and Appendix 5B
July 26, 2019
Continuation of Voluntary Suspension
July 9, 2019
Continuation of Voluntary Suspension
July 1, 2019
Continuation of Voluntary Suspension
June 18, 2019
Continuation of Voluntary Suspension
June 13, 2019
Suspension from Official Quotation
June 11, 2019
Trading Halt
June 11, 2019
Pause in Trade
June 3, 2019
Farm-in Agreement for Hatches Creek Tungsten Project
June 3, 2019
TGN: Hatches Creek Tungsten Project Farm-in Agreement
May 22, 2019
Response to ASX Price Query
May 22, 2019
Reinstatement to Official Quotation
May 22, 2019
Drilling Results Hatches Creek Project
May 21, 2019
Voluntary Suspension
May 17, 2019
Trading Halt
May 17, 2019
Pause in Trading
April 30, 2019
March Quarterly Report and Appendix 5B
April 29, 2019
Project Updates
March 8, 2019
Half Year Accounts
January 31, 2019
December Quarter Report and Cashflow
January 15, 2019
Exciting Drilling Results Wiluna West Gold Project
December 20, 2018
General Manager Appointment
December 6, 2018
Change of Director's Interest Notice - Mr Lee
December 6, 2018
Change of Director's Interest Notice - Mr Lau
December 6, 2018
Change of Director's Interest Notice - Mr Law
December 6, 2018
Change of Director's Interest Notice - Mr Lyons
December 6, 2018
Appendix 3B
November 23, 2018
Results of Meeting
November 23, 2018
BLK: Agreement Over Wiluna West Gold Project
November 23, 2018
Binding Heads of Agreement with Blackham Resources
November 9, 2018
Wiluna West Gold RC Drilling
October 31, 2018
September Quarterly Report and Appendix 5B
October 30, 2018
Appendix 4G
October 30, 2018
Corporate Governance Statement
October 30, 2018
2018 Annual Report
October 29, 2018
Wiluna West Gold Project Update - Additional Information
October 26, 2018
Wiluna West Gold Project Update
October 26, 2018
Notice of Annual General Meeting/Proxy Form
October 26, 2018
Hatches Creek Sale Update
October 26, 2018
TGN: Hatches Creek Acquisition Update
October 25, 2018
Trading Halt
September 27, 2018
2018 Financial Report
September 3, 2018
Hatches Creek Sale to Realise $8.7million
September 3, 2018
TGN: Terms agreed to acquire Hatches Creek Tungsten Project
July 31, 2018
June Quarterly Report and Appendix 5B
July 27, 2018
Wiluna West Gold Project Update
July 27, 2018
Change in substantial holding for TGN
July 17, 2018
Hatches Creek Exploration Target Estimate and Project Update
May 29, 2018
Change in substantial holding for TGN
April 30, 2018
March Quarterly Report and Appendix 5B
March 29, 2018
Ceasing to be Substantial Holder
March 29, 2018
Initial Substantial Holder Notice
March 7, 2018
Half Year Accounts
February 28, 2018
Response to ASX Price and Volume Query
January 31, 2018
December Quarterly Report and Appendix 5B
General Manager Appointment
December 6, 2018
Change of Director's Interest Notice - Mr Lee
December 6, 2018
Change of Director's Interest Notice - Mr Lau
December 6, 2018
Change of Director's Interest Notice - Mr Law
December 6, 2018
Change of Director's Interest Notice - Mr Lyons
December 6, 2018
Appendix 3B
November 23, 2018
Results of Meeting
November 23, 2018
BLK: Agreement Over Wiluna West Gold Project
November 23, 2018
Binding Heads of Agreement with Blackham Resources
November 9, 2018
Wiluna West Gold RC Drilling
October 31, 2018
September Quarterly Report and Appendix 5B
October 30, 2018
Appendix 4G
October 30, 2018
Corporate Governance Statement
October 30, 2018
2018 Annual Report
October 29, 2018
Wiluna West Gold Project Update - Additional Information
October 26, 2018
Wiluna West Gold Project Update
October 26, 2018
Notice of Annual General Meeting/Proxy Form
October 26, 2018
Hatches Creek Sale Update
October 26, 2018
TGN: Hatches Creek Acquisition Update
October 25, 2018
Trading Halt
September 27, 2018
2018 Financial Report
September 3, 2018
Hatches Creek Sale to Realise $8.7million
September 3, 2018
TGN: Terms agreed to acquire Hatches Creek Tungsten Project
July 31, 2018
June Quarterly Report and Appendix 5B
July 27, 2018
Wiluna West Gold Project Update
July 27, 2018
Change in substantial holding for TGN
July 17, 2018
Hatches Creek Exploration Target Estimate and Project Update
May 29, 2018
Change in substantial holding for TGN
April 30, 2018
March Quarterly Report and Appendix 5B
March 29, 2018
Ceasing to be Substantial Holder
March 29, 2018
Initial Substantial Holder Notice
March 7, 2018
Half Year Accounts
February 28, 2018
Response to ASX Price and Volume Query
January 31, 2018
December Quarterly Report and Appendix 5B
December 22, 2017
Change of Director's Interest Notice - Mr Lyons
December 22, 2017
Change of Director's Interest Notice - Mr Lee
December 22, 2017
Change of Director's Interest Notice - Mr Law
December 22, 2017
Change of Director's Interest Notice - Mr Lau
December 22, 2017
Change of Director's Interest Notice - Mr Wilson
December 22, 2017
Share Purchase Plan Closed
December 20, 2017
Projects Update
December 5, 2017
Share Purchase Plan - Offer Extended
December 5, 2017
2017 Company Presentation
November 24, 2017
2017 AGM Results
November 22, 2017
Share Purchase Plan Offer Update
November 22, 2017
Share Purchase Plan Cleansing Statement
November 22, 2017
Share Purchase Plan
November 8, 2017
Hatches Creek Tungsten Exceptional RC Drilling Results
October 31, 2017
September Quarterly Report and Appendix 5B
October 31, 2017
Gold Resource Update
October 20, 2017
Notice of Annual General Meeting
October 12, 2017
Further Significant RC Drilling Results
October 6, 2017
Wiluna West Gold Update - Amended
September 26, 2017
Appendix 4G
September 26, 2017
Corporate Governance Statement
September 26, 2017
2017 Annual Report
September 21, 2017
Significant Wiluna Gold Drilling Results
September 19, 2017
Hatches Creek Tungsten RC Drilling Results - Amendment
September 14, 2017
Hatches Creek Tungsten Project RC Drilling Results
September 11, 2017
Hatches Creek RC drilling program completed
July 31, 2017
June Quarterly Report and Appendix 5B
July 21, 2017
Wiluna West Gold Drilling Update
June 28, 2017
EXG: Debt Reduction and Market Update
June 28, 2017
Exploration ramps up at Wiluna West Gold Project
June 27, 2017
$2.25m financing repaid to GWR Group
June 14, 2017
Hatches Creek Project Update
April 28, 2017
March Quarterly Report and Appendix 5B
March 15, 2017
Ceasing to be a substantial holder
March 15, 2017
Becoming a substantial holder
March 15, 2017
Exceptional results from Hatches Creek Drilling (Amendment)
March 14, 2017
Exceptional results from Hatches Creek Drilling
March 8, 2017
Half Year Accounts 31 December 2016
February 15, 2017
Appendix 3B
January 31, 2017
December 2016 Quarterly Report & Appendix 5B
January 31, 2017
GWR Group and Blackham Resources sign MoU
Change of Director's Interest Notice - Mr Lyons
December 22, 2017
Change of Director's Interest Notice - Mr Lee
December 22, 2017
Change of Director's Interest Notice - Mr Law
December 22, 2017
Change of Director's Interest Notice - Mr Lau
December 22, 2017
Change of Director's Interest Notice - Mr Wilson
December 22, 2017
Share Purchase Plan Closed
December 20, 2017
Projects Update
December 5, 2017
Share Purchase Plan - Offer Extended
December 5, 2017
2017 Company Presentation
November 24, 2017
2017 AGM Results
November 22, 2017
Share Purchase Plan Offer Update
November 22, 2017
Share Purchase Plan Cleansing Statement
November 22, 2017
Share Purchase Plan
November 8, 2017
Hatches Creek Tungsten Exceptional RC Drilling Results
October 31, 2017
September Quarterly Report and Appendix 5B
October 31, 2017
Gold Resource Update
October 20, 2017
Notice of Annual General Meeting
October 12, 2017
Further Significant RC Drilling Results
October 6, 2017
Wiluna West Gold Update - Amended
September 26, 2017
Appendix 4G
September 26, 2017
Corporate Governance Statement
September 26, 2017
2017 Annual Report
September 21, 2017
Significant Wiluna Gold Drilling Results
September 19, 2017
Hatches Creek Tungsten RC Drilling Results - Amendment
September 14, 2017
Hatches Creek Tungsten Project RC Drilling Results
September 11, 2017
Hatches Creek RC drilling program completed
July 31, 2017
June Quarterly Report and Appendix 5B
July 21, 2017
Wiluna West Gold Drilling Update
June 28, 2017
EXG: Debt Reduction and Market Update
June 28, 2017
Exploration ramps up at Wiluna West Gold Project
June 27, 2017
$2.25m financing repaid to GWR Group
June 14, 2017
Hatches Creek Project Update
April 28, 2017
March Quarterly Report and Appendix 5B
March 15, 2017
Ceasing to be a substantial holder
March 15, 2017
Becoming a substantial holder
March 15, 2017
Exceptional results from Hatches Creek Drilling (Amendment)
March 14, 2017
Exceptional results from Hatches Creek Drilling
March 8, 2017
Half Year Accounts 31 December 2016
February 15, 2017
Appendix 3B
January 31, 2017
December 2016 Quarterly Report & Appendix 5B
January 31, 2017
GWR Group and Blackham Resources sign MoU